EV Purchase & Delivery
High-stakes purchases and complex multi-party buying decisions across consumer and commercial segments.
This interactive experience is the shipped product itself — the same application code customers run in production, mounted read-only in your browser over a real sample journey. Not a video, not a mockup: because the demo and the product are one codebase, it can never drift from the real thing.
Inside this journey
-
EV Needs Discovery
Align on daily driving patterns, range requirements, household charging constraints, incentive triggers, and decision-makers.
Discovery Questions
Start with Your Driving Day
- Tell me about a typical weekday drive, from leaving home to returning.
- How many miles do you cover in an average weekday roundtrip?
- On a typical week, how many days do you drive this vehicle?
- Who else in your household regularly shares driving or charging responsibilities?
Where Range Really Breaks Your Day
- If your next charge failed mid-route, which trip would cause the biggest problem for you?
- Select the trips below that are essential and cannot be rescheduled.
- How often do you take longer trips that exceed your daily routine?
- Rate your confidence that published range figures match real-world performance on your regular routes.
- Identify the single route or use case that, if it required more than the vehicle can offer, would stop you from buying this EV.
Charging at Home, Not in the Manual
- Most buyers assume home charging is simple. What about your home makes it harder than they expect?
- Do you currently have access to dedicated off-street parking?
- Identify the power source that serves your parking area.
- Who in your household is responsible for electrical decisions or approvals?
- Have you installed major electrical upgrades in the last 5 years?
- Is there any landlord, HOA, or building rule that would prevent installation of a charger at your parking spot?
Timing, Costs, and the Incentive Pull
- If incentives changed tomorrow, how much would it shift your decision timeline?
- Select the incentives you have already confirmed or applied for.
- Rate the importance of immediate monthly cost reduction compared with long term savings.
- What target delivery window do you have for taking possession of a vehicle?
- Would losing an expected incentive be a deal breaker for you?
Who's Actually Signing Off?
- List anyone in your household or organization who could veto this purchase even if price and range check out.
- List the decision-makers by role and the influence they hold.
- Rank the factors that carry the most weight for each decision-maker.
- Has anyone had a negative past experience with EVs that influences their view?
- State who has final sign-off authority and the conditions under which they would withhold approval.
The Deal Breakers We Need to Know
- Name the one ownership concern that would make you walk away from an EV purchase today.
- Describe your level of concern about battery degradation over 3 to 8 years.
- Have you experienced any installation or permit delays with prior home projects?
- Describe how a temporary loss of charging access for 2 weeks would affect daily routines or work.
- Is there any non-negotiable constraint that must be resolved before you can move forward?
Who Else Are You Talking To?
- Why might you choose to stay with your current gasoline vehicle or manage charging internally instead of buying an EV?
- Select the alternatives you are actively considering.
- Explain the conditions under which you would remain with your current approach rather than change.
- Has anyone on your team proposed handling installation or incentives internally rather than working with an outside partner?
- Would a written guarantee of no installation hassles and a fixed total cost make that alternative your preferred choice?
Can We Actually Install It When You Want?
- Point out the single site or permission detail you expect will slow scheduling the most.
- Do you know your home's main electrical panel capacity or available spare breaker spaces?
- Confirm whether your parking location is on private property with contractor access.
- Will you need a permit, landlord approval, or HOA sign-off before installation?
- Does your household have anyone who can sign permits or meet installers during work hours?
- Are any of the following missing now and therefore block scheduling: accessible panel, approval, or dedicated parking?
If This Looks Right, How Do We Close?
- Assuming the route and charging plan meet your needs, what would make you ready to sign that week?
- Choose the deliverables at signing that matter most to you.
- Mark any timelines that would be unacceptable for delivery and installation.
- Provide the primary contact on your side who can finalize incentives and installation logistics.
- Name a single commitment from us that would accelerate your signature to within 7 days.
-
Ownership & Charging Walkthrough
Walk through route-specific range modeling, charging workflows (home, workplace, public), and battery-warranty implications in the buyer's real context.
Solution Experience
- Ownership & Charging Walkthrough
- Confirm the current state and its cost
- You confirm the demonstrated route-level range model matches your actual commute patterns and would change your confidence to proceed.
- Deliver the route-specific range model PDF and three recommended charger configurations with estimated installation cost within 3 business days.
- Run a route-specific range model for your typical trips
- You accept the proposed home/work/public charging workflows and the minimum home electrical requirements needed to avoid installation rework.
- Provide clear photos of the home electrical panel and typical parking location to validate installation assumptions.
- Walk through charging workflows in your actual locations
- Confirm the list of decision-makers and the target purchase deadline to align incentive timing and next approvals.
- You agree on acceptable warranty outcomes and what remaining evidence is required before final vehicle selection.
- Schedule a site survey if home electrical constraints require an on-site inspection before finalizing installer scope.
- Show battery-warranty and degradation scenarios
- Validate the future state
- Agree next steps to lock charging scope
- Ownership & Charging Walkthrough
- Ownership & Charging Walkthrough Deck
- Ownership & Charging Solution Brief
- meeting
- slides
- document
-
Solution Scope
Define vehicle configuration, warranty terms, included charging equipment, installation responsibilities, and incentive processing scope.
Scope Configuration
- Complete EV purchase and title transfer
- Process federal and state EV incentives at sale
- Procure and install home EVSE (Level 2 charger)
- Activate connected vehicle services and telematics
- Deliver route-specific range simulation report
- Provide battery warranty and degradation data package
- Create and configure public charging network accounts
- Deliver EV ownership and charging education session
- Perform vehicle trade-in processing and settlement
- Deliver vehicle handover with systems demonstration
- Install workplace EV charging stations
- Deliver fleet total-cost-of-ownership and financing analysis
Scope Questions
Complete EV purchase and title transfer
- Do you intend to register the vehicle in the same state as the delivery address?
- Which name and mailing address should appear on the vehicle title and registration?
- Indicate the preferred method for funds transfer at signing (for example certified check, bank transfer, or lender payoff integration).
- List any existing liens, lender names, and current payoff amounts for the trade-in or titled vehicle.
- Confirm the full name and contact for the authorized signer who will complete DMV paperwork and title transfer.
- Are there special registration requirements at delivery such as commercial/fleet plates, temporary transit plates, or handicap placards?
Process federal and state EV incentives at sale
- Identify expected incentive programs you want processed (for example federal EV tax credit with IRS Form 8936, state point-of-sale rebate, utility rebate).
- Upload or indicate what eligibility documentation you already have for incentive claims (proof of residence, purchase agreement draft, lease paperwork).
- Who should be listed as the contact responsible for signing and submitting incentive authorizations and rebate affidavits?
- Confirm whether you require incentives to be applied at point of sale (reducing buyer price) or claimed after delivery via tax filing or rebate application.
- Is there manufacturer or model-specific documentation required to support incentive eligibility (for example manufacturer compliance letters or MSRP caps)?
Procure and install home EVSE (Level 2 charger)
- What is your electrical service capacity at the delivery address as shown on the main breaker label (amps)?
- Attach a recent single-line diagram (SLD) or a clear photo of the electrical panel and meter location to support circuit sizing and permit submissions.
- Choose required Level 2 EVSE attributes for the home installation (for example hardwired vs NEMA plug, networked telematics, cable length required).
- Estimate the distance and typical conduit path from the main service panel to the proposed EVSE mounting point in feet.
- What acceptance criteria will confirm a successful home EVSE installation (for example permit issued, final electrical inspection passed, charger energized and paired to vehicle)?
Activate connected vehicle services and telematics
- Select which connected vehicle services you require active at delivery (for example remote charge start, battery health reporting, over-the-air software updates).
- Enter the account email and preferred username to be used for telematics and in-vehicle app provisioning.
- Provide the integration endpoint or fleet telematics platform type that must receive vehicle data and the core data fields required (VIN, state of charge, odometer).
- State whether cellular provisioning for the vehicle and/or home charger is required on-site or whether Wi-Fi onboarding will be used.
- Describe any data retention or privacy constraints for telematics logs (for example retain state-of-charge logs for 12 months or restrict geolocation sharing).
Deliver route-specific range simulation report
- Name the representative route segments to be modeled (for example home-to-work commute, midday errands, weekend trip) and provide round-trip mileage for each.
- Give representative ambient temperature ranges and seasonal conditions for the routes to model HVAC and energy impacts.
- Identify specific charging opportunities on each route by address or known point of interest (home charger, workplace station, preferred public station).
- Specify the vehicle configuration assumptions for the simulation (battery usable kWh, wheel/tire package, HVAC setpoints used during modeling).
- How will you verify the simulation's accuracy after delivery (for example record actual energy use for 30 days and compare to modeled kWh per mile)?
Provide battery warranty and degradation data package
- Define the battery warranty terms you require documented including duration (years), mileage, and the degradation threshold that triggers service.
- Share any existing battery health or degradation datasets, laboratory test results, or previous SOH (state-of-health) reports you want included in the package.
- State the acceptable end-of-life capacity threshold and the measurement method you expect (for example 70% measured by full-charge capacity test at ambient 20°C).
- Choose preferred formats for the warranty and degradation deliverables (for example PDF summary, CSV degradation table, charted state-of-health curves).
- Are third-party battery health validation or independent capacity tests required at handover (for example third-party full-charge/discharge certificate)?
Create and configure public charging network accounts
- Indicate whether you need individual driver accounts, centralized fleet master accounts, or both for public charging networks.
- Provide the payment method type to be registered for public charging transactions (for example corporate card, central billing account, driver-level billing).
- Specify geographic coverage areas that must be included for network access (for example city names, counties, or states where drivers regularly operate).
- Detail required access controls for chargers (for example RFID tags, mobile app single sign-on, PIN) and who will manage issuance and revocation.
- When do you prefer billing reconciliation for charging sessions and in which export format (for example monthly CSV, weekly API feed)?
Deliver EV ownership and charging education session
- List the learners who should attend the education session by role (for example primary driver, secondary household driver, fleet maintenance lead).
- Pick preferred session length and delivery mode for the ownership briefing (30, 60, or 90 minutes; in-person or virtual).
- Highlight specific topics you want emphasized during training (for example route-based charging strategy, battery longevity best practices, public charging etiquette).
- Tell us how you prefer follow-up materials to be delivered after the session (for example annotated route report, printed quick-start guide, recorded video).
- Do you require a signed attendee acknowledgment or completion certificate to confirm the education session was delivered?
Perform vehicle trade-in processing and settlement
- Record the current mileage and VIN of the trade-in vehicle.
- Describe known mechanical or cosmetic issues and attach recent photos to be included in the appraisal packet.
- Outline the desired payoff process for any existing loan on the trade-in (for example we request lender payoff letter, you arrange direct payoff, or include in new financing).
- Select your preferred timing for applying trade-in credit: at signing, at delivery, or after title transfer.
- State whether there are title-holding complexities we should plan for (co-owners, out-of-state title, power of attorney).
Deliver vehicle handover with systems demonstration
- Who will attend the vehicle handover and systems demonstration (for example primary driver, fleet manager, fleet technician)?
- Specify the VIN and any driver profiles or key fobs that should be preloaded for the demonstration.
- Choose which systems require live demonstration during handover (for example start/stop a charging session, regenerative braking modes, driver-app pairing, adaptive cruise setup).
- List the exact items you require on the written handover checklist (for example signed vehicle inspection report, EVSE pairing confirmation, charging cable inventory).
- Specify desired duration for the handover session and whether on-site charger integration testing is required.
Install workplace EV charging stations
- Attach the site's electrical one-line diagram and indicate available spare circuit count per distribution panel for proposed charger locations.
- Choose the preferred charger access control model for the workplace (open public, employees only via RFID/app, or fleet-only with network authentication).
- Enumerate site constraints that could affect charger placement such as parking geometry, Americans with Disabilities Act (ADA) requirements, curb restrictions, or daytime access windows.
- State required installer qualifications and insurance thresholds (for example electrical contractor license, general liability limits).
- Will post-installation load management or demand charge mitigation integration be required for the chargers (for example site energy management platform or static load sharing)?
- Describe any required physical protections for workplace chargers (for example bollards, weather enclosures, or locked cabinets).
Deliver fleet total-cost-of-ownership and financing analysis
- Submit baseline fleet metrics required for TCO modeling: average annual mileage per vehicle, annual fuel spend, and maintenance cost per mile.
- Name any financing preferences or constraints we should model (for example lease term length, target residual, balloon payment, tax-exempt financing).
- Select the timeframe for the total-cost-of-ownership (TCO) analysis and whether to include scenario comparisons (for example 3 years, 5 years, 10 years).
-
Mutual Commit
Finalize pricing, incentive application, delivery and installation terms, warranties, and mutual acceptance criteria.
Agreement Modules
- Purchase Agreement
- Statement of Work (SOW)
- Master Services Agreement (MSA)
- Incentive Processing & Assignment Confirmation
- Workmanship & Product Warranty Agreement
- Delivery & Installation Terms Addendum
- Site Access & Utility/Permit Authorization
- Installation Acceptance Certificate
- Change Order Agreement
- Payment Schedule & Deposit Receipt
-
Installation & Delivery
Coordinate vehicle delivery, charger installation, inspections, and acceptance to ensure safe, on-time handover.
-
Pre-Installation Readiness
Capture concrete readiness facts — electrical panel capacity, permit status, site access windows, fleet site constraints, and named contacts needed before scheduling work.
Pre-Deployment Questions
Environment and site access
- What is the installation site type? (Select the best match; this determines access rules and permit pathways.)
- Is the installation/delivery address confirmed? (We need confirmation before scheduling crews; do not paste the address here if you prefer to provide it in DeploymentConfig.)
- Are there site access restrictions or requirements we should plan around? (e.g., business hours, security checkpoints, required escorts)
Electrical capacity and permits
- Has a licensed electrician verified the electrical panel capacity for the proposed charger? (This determines whether a panel upgrade is required before installation.)
- What is the current permit status for charger installation? (Select the option that best reflects where you are in the local permitting process.)
- Will the installation require a new dedicated circuit, or can it use existing wiring? (This impacts electrician scope and timeline.)
People and ownership
- Primary on‑site contact for installation (name, role, best phone or email). This person will meet the installer and sign access/entry forms.
- Who will own permit approvals and day‑of installer coordination? (This is the single point the deployment team will contact for approvals and access.)
Timing and constraints
- Target installation date or earliest available window (enter a date or date range). This informs crew and equipment scheduling.
- Are there operational blackout periods or recurring site constraints (shift changes, deliveries, events) that will block work? (Select the best match.)
-
Installation Configuration
Lock exact configuration values the teams will use — selected EVSE model, circuit sizing, vehicle VIN, delivery address, installer contact, and target installation date.
Configuration Details
Installation Configuration — Profile
- Select installation profile (Default: Residential Single-Unit) — consumed by the installer routing and parts BOM
- If 'Other', specify installation profile name (free text) — exact value deployed to scheduling rules
- Configuration version tag (format: alphanumeric, e.g., 'v1.0'; Default: v1.0) — used to lock this configuration snapshot
- Configuration owner (enter role and full name, format: 'Role — Full Name'; e.g., 'Seller — Jane Doe') — used on change approvals
Vehicle Identification
- Vehicle VIN (enter exact 17-character VIN) — consumed by delivery manifest and vehicle handover
- Vehicle inventory model code (as used in your inventory system; e.g., 'ModelX-LR') — used to map vehicle specs
- Vehicle trim/option package code (as used in inventory) — locks vehicle-specific charger settings
- Vehicle delivery odometer to record at handover (numeric miles; Default: 0) — numeric value recorded in handover log
- Is the vehicle already assigned to this order? (Default: Yes) — toggles delivery sequencing
EVSE & Electrical Configuration
- EVSE variant to install (select one; Default: Level 2 — Hardwired 40A) — controls parts list and electrical scope
- If 'Other' or 'Customer-supplied', provide EVSE model identifier (manufacturer model code or buyer-provided label) — free text
- Required continuous circuit capacity in amps (numeric; enter whole amps — Default 40) — electrical-sizing parameter
- Circuit breaker size in amps (numeric; recommended default 50 for a 40A continuous circuit) — breaker value deployed to the electrician work order
- Service voltage (Default: 240V) — consumed by electrical design
- Connector type to be installed (Default: SAE J1772) — select one
- Charger cable length to be supplied by installer (numeric feet; Default: 20) — feet value used in parts list
- Mounting method for EVSE (Default: Hardwired flush/garage wall) — select one
- Is the EVSE to be hardwired or plug-in? (Default: Hardwired) — this sets installation wiring tasks
- Include dedicated subpanel installation? (Default: No) — Yes/No toggles subpanel work order
Site Delivery & Location Details
- Installation street address (format: 'Street address, City, State/Province, Postal code') — exact deployment address
- Is the delivery address the same as the installation address? (Default: Yes) — determines delivery routing
- If different, provide delivery address (format as above) — used for vehicle or equipment delivery
- Unit/Building access details (single value; format: 'Unit # / Gate code / Access instructions') — used on day-of-installation instructions
- Physical site location for EVSE installation (Default: Garage — interior) — single select
- Is a dedicated parking/stall assigned for the vehicle? (Default: Yes) — toggles assignment fields
- If assigned, provide stall identifier or designation (e.g., 'Stall A3') — exact string used in delivery manifest
Installer & Contact Information
- Primary installer company legal name (exact) — used on work orders and permits
- Primary installer project manager name (Full Name) — day-of contact
- Primary installer contact phone (format: +CountryCode Number, e.g., +1 5551234567) — used for scheduling notifications
- Primary installer contact email (format: name@domain) — used for digital dispatch
- Installer license or contractor ID (enter identifier; do not upload licenses here) — stored as reference on permits
- Installer assigned lead technician name (Full Name) — used for day-of coordination
- Installer scheduling SLA in calendar days from configuration lock to target installation (numeric; Default: 14) — numeric
Scheduling & Date Parameters
- Target installation date (format: YYYY-MM-DD) — primary scheduled date used by the planner
- Alternate installation window start date (YYYY-MM-DD) — used if primary date shifts
- Alternate installation window end date (YYYY-MM-DD) — used with the start date to form the fallback window
- Requested installation start time window (format: HH:MM-HH:MM local time; Default: 08:00-16:00) — time window for day-of ETA
- Is weekend installation allowed? (Default: No) — Yes/No
- Is expedited scheduling required (charges/approval handled separately)? (Default: No) — Yes/No
Permits, Inspections & Regulatory
- Will a municipal/electrical permit be required for this installation? (Default: Yes) — Yes/No
- Permit holder (select who will be listed as permit applicant) — single select
- If 'Third-party' or 'Other', provide the permit holder legal name (exact) — used on permit application
- Expected permit approval date (format: YYYY-MM-DD) — used to gate installation scheduling
- Electrical inspection required after installation? (Default: Yes) — Yes/No
- If known, inspector authority or office name (single value) — reference for inspection coordination
Handover, Commissioning & Acceptance
- Final acceptance owner role (Default: Buyer) — who signs off final installation acceptance
- Acceptance checklist variant (Default: Standard Installation Acceptance v1) — select one
- If 'Custom checklist' selected, provide checklist URL or document ID (format: https://... or DOC-ID) — exact value used by acceptance workflow
- Enable remote commissioning/telemetry activation at acceptance? (Default: Yes) — Yes/No (note: credentials exchanged out-of-band if needed)
- Require buyer on-site presence for acceptance? (Default: Yes) — Yes/No
- Post-installation warranty registration owner (select one) — single select
Notifications, Escalations & Ownership
- Primary notifications email for installation updates (format: name@domain) — used by scheduling and dispatch
- Backup notifications email (format: name@domain) — secondary contact
- Notify which roles on key events (select all that should receive automated event notifications)
- Owner of final configuration lock (enter role and full name; format: 'Role — Full Name') — who may approve any post-lock changes
- Escalation contact (role and full name) for day-of issues (e.g., 'Installer — John Smith') — single value used for urgent routing
-
Installation & Delivery
Execute scheduled vehicle handover and charger installation with clear owners, sequencing, and contingency plans.
-
Installation Acceptance
Verify electrical permits, inspector/electrician sign-off, safety checks, and final buyer acceptance before enabling charging and closing installation items.
Checklist items
- Obtain written Permission to Energize (PTO) or utility authorization
- Confirm local electrical inspection passed and signed report received
- Verify Lockout/Tagout (LOTO) applied and documented prior to energization
- Complete and upload electrical safety and performance test results
- Confirm overcurrent protection and circuit configuration match approved as-built design
- Upload as-built documentation and verify panel labeling in-place
- Complete EVSE/charger commissioning and functional test
- Verify site safety features and protective measures are installed
- Collect and record equipment identifiers and installation evidence
- Obtain final buyer operational handover and signed acceptance
- Submit installation closeout package to seller/platform
-
-
Success
Confirm outcomes, monitor battery performance and charging behavior, track warranty and installation issues, and capture buyer feedback for continuous improvement.
Success Reviews
- Go-live health check (weeks 1-4)
- First measurement review (weeks 4-10)
- 90-day outcomes review (around day 90)
- Quarterly success review (ongoing operational cadence)
Issues & Enhancements
- Close any resolved warranty or installation tickets and attach validation evidence to the ticket record.
- Schedule and execute any required charger firmware updates, configuration changes, or site fixes and log verification results.
- Open or update warranty/installation tickets with clear reproduction steps and desired resolution criteria.
- Restate acceptance criteria and evidence sources
- Document pass/partial/fail status for each Mutual Commit target as observed over the first 90 days and list remediation actions where needed.
- Establish a clear remediation and verification plan for any outstanding installation or warranty issues with resolution dates.
- Publish the 90-day outcomes dossier that includes metric trends, issue logs, and the remediation plan with verification criteria.
- Create a time-bound remediation tracker for any unmet targets with specific validation steps to be completed before the next quarterly review.
- Collect final inspector or electrician confirmations for any items listed as resolved and attach to the outcomes dossier.
- Trend review of key metrics
- Confirm whether charger uptime percentage and buyer satisfaction score are within acceptable bounds or require targeted intervention.
- Ensure all persistent warranty and installation issues have an agreed next step and a target close date, or are escalated with rationale.
- Update the quarterly dashboard with charger uptime, buyer satisfaction, range stability, and open issue counts for shared visibility.
- Document one process or configuration change to trial based on buyer feedback and define success criteria for the trial.
- Reconfirm committed acceptance criteria and owners
- All high-priority deployment defects and permit blockers are identified and assigned a remediation task and target date.
- Customer confirms they can complete an initial home charge and access vehicle/charger telemetry or the remediation path is scheduled.
- Publish a remediation tracker listing each open installation or permit item, expected resolution date, and verification criteria.
- Collect and share first-charge logs or telemetry for any failed sessions for diagnostic review.
- Present initial usage and performance data
- Determine whether average real-world range per full charge and home charging session success rate meet or miss Mutual Commit targets and document variance reasons.
- Agree a prioritized list of corrective actions with resolution windows to bring metrics in line with commitments before the 90-day review.
- Produce a variance report that maps measured range and charging success rate to Mutual Commit targets and lists suspected root causes.
- Deployment and enablement validation
- Persistent issue review
- Compare results to targets in Mutual Commit
- Present 90-day telemetry and issue summary
- Assessment and decision
- Remediation item burn-down
- Diagnose gaps and identify root causes
- Early adoption signals
- Customer feedback and learning capture
- Open warranty and installation issue review
- Open issues triage
- Closure plan for remaining items
- Immediate remediation plan
- Agree corrective actions and timeline