EPC Project Delivery
Inside this journey
-
Pre-Discovery
Align the room on outcomes, decision process, and constraints before deeper discovery.
-
Stakeholder Alignment
Confirm decision roles, approval gates (finance, engineering, HSE, board), timeline, and what ‘good’ looks like for schedule, cost, and performance guarantees.
Alignment Questions
Quick Project Snapshot
- In one sentence, how would you describe this project and its primary objective?
- Which industry best describes this project?
- What is the current capital estimate range you expect to sanction?
- Which project phase are you currently in?
- Where is the primary site located (country / region) and are there multiple locations to coordinate?
- Who will be our day-to-day counterpart on your side (primary role)?
Where the Pressure Is Happening
- What single failure today would most likely derail this project’s approval or schedule?
- Which of these pressures currently feel most urgent for your team?
- How long have those pressures been affecting decision-making?
- Can you describe a recent example where one of these pressures changed a timeline, scope, or approval?
- Which internal stakeholder or function feels the greatest reputational or financial exposure if the project slips?
Who Really Decides?
- If this project had a single veto, who holds it and under what circumstance would they use it?
- Which approval gates must be passed before you can take a positive FID?
- What is your expected internal timeline to clear those gates?
- Who outside the owner team will materially influence sign-off (lenders, offtakers, insurers, partners)?
- How do you prefer to receive commercial and technical inputs during the approval process?
How Much Certainty Do You Need?
- Would you rather lock in price and schedule now even if it's higher, or keep cost flexibility and accept more risk later?
- Which contract pricing model aligns best with your board's risk appetite?
- What schedule guarantee format would you require (for example, fixed date, milestone LDs, or incentives)?
- Which performance guarantees are non‑negotiable for you at handover?
- What range of liquidated damages would your finance team consider acceptable relative to contract value?
Where the Real Risks Live
- Which unseen risk today has the highest probability of breaking this project during execution?
- Which long‑lead equipment or services do you see as critical constraints for delivery?
- What are the realistic lead times for those top items in your view?
- Describe any site constraints that materially affect mobilization or construction sequencing (access, foundations, marine, grid connection, seasonal windows).
- Which permitting, community, or local workforce issues could delay mobilization?
What Success Will Feel Like
- If you had to defend this project's success to the board in five years, what three concrete outcomes would you point to first?
- Which measurable KPIs will you use to judge whether this project delivered value?
- What are the target numbers or thresholds you expect for your top two KPIs?
- How should acceptance testing and performance validation be structured to satisfy you?
- What post‑completion support is critical to your operations team (warranty length, spare parts, training, remote monitoring)?
Deal‑Breakers and Red Lines
- What could an EPC say or promise in a pitch that would make you walk away immediately?
- Which of the following are absolute red lines for your team when selecting a delivery partner?
- Have you ever terminated or replaced an EPC mid‑project? If yes, what was the primary reason?
- What minimum proof points would overcome those red lines for you?
- Which contractual protections are essential for you to feel comfortable moving forward?
Fast‑Forward: What Would Earn Your Trust in 30 Days?
- If we had 30 days to earn your trust, what is the single deliverable or action you would insist on seeing before progressing?
- Which short, tangible activities would move you closest to a decision in that timeframe?
- Who on your side must be convinced before you can recommend advancing (list roles)?
- What documents or deliverables should we prepare for your next decision meeting?
- How soon can you make the necessary people and baseline information available for a rapid decision sprint?
-
Current Project Mapping
Document current project status, site constraints, long-lead items, permits, prior studies, and key risks to delivery.
Current State
Quick Snapshot: Where We Really Are
- Which phrase best describes your project's current phase?
- What is the current internal target sanction or Final Investment Decision (FID) month and year?
- How would you classify the current budget position for the work we would scope with you?
- Who on your team is the single point of coordination for project information and decisions?
- How confident are you that the information you have today (drawings, studies, cost estimates) is sufficient to define delivery risk?
- If you had to give one short sentence that captures your biggest worry about the project's current status, what would it be?
What Are We Not Seeing That Matters?
- If this project surprised you tomorrow, what single unknown would cause the biggest schedule slip?
- Which of these unknowns do you feel most uncertain about right now?
- How recently has the baseline project information (layouts, MTOs, vendor lists) been updated?
- Tell us about a recent change or surprise on this project — what happened and how much impact did it have?
The Bottlenecks That Keep You Awake at Night
- Which single delivery constraint scares you the most if it goes wrong?
- What are the specific long-lead items you already have on your radar? Please list vendor, item, and current delivery estimate if available.
- How are you currently managing supplier concentration risk for those long-lead items?
- How exposed is the project to seasonal or weather-driven schedule windows (e.g., winter freeze, monsoon, river levels)?
- When you think about construction execution, which capacity constraint worries you most—local labor, specialist crews, fabrication capacity, or logistics—and why?
Permits, Studies, and The Paper Trail Nobody Reads Until It’s Too Late
- Are there any permits or approvals that, if delayed, would stop the project from starting on the planned date?
- Which of the following studies are completed, in progress, or outstanding for this site? (Select all that apply and specify owner/date in the free text follow-up)
- Who currently owns the permit and study coordination with regulators (title/organization)?
- Have there been any regulatory or community objections in past projects at this site or nearby that we should know about?
- If a permit or study were to take twice as long as expected, what contingency or mitigation would you want to see from a contractor?
Site Realities vs. What the Plans Promise
- What site constraint do you suspect is under-represented in the current design pack (e.g., access road width, staging area, utilities)?
- How reliable are the existing site utilities (power, water, sewer, communications) for construction and early operations?
- Can heavy equipment and module transports reach the site today, or will upgrades to roads/bridges/ports be required?
- Describe any on-site factors that have emotional or political weight (e.g., local community expectations, indigenous land claims, union relationships). How do they influence decisions?
- Who on your team can provide the latest as-built, survey, or site photos within 48 hours if we request them?
What Delivery Risk Would You Pay to Remove Today?
- If you had to accept one commercial trade-off to reduce schedule risk, what would you be open to—pay more, accept a target price, provide incentives, or change milestones?
- What contingency percentage of the current estimate do you consider acceptable to protect schedule and performance?
- Have you previously asked contractors for vendor guarantees or supplier escrow for long-lead items? What worked or didn’t?
- How important is contractor financial strength vs. execution approach when you weigh proposals?
- What would you consider a non-negotiable guarantee for us to include in a proposal (schedule date, performance metric, LD cap, bonding)?
If We Could Clear One Thing This Week, What Would Unlock the Most Value?
- What single document, decision, or piece of information would reduce your biggest current risk immediately?
- Who needs to be involved from your side to unblock that item and are they available for a decision within two weeks?
- Would you be willing to run a short, focused workshop with our delivery leads to fast-track assumptions and align on mitigation options?
- What format of deliverable would be most useful to you after that workshop (risk register, revised schedule, procurement plan, go/no-go decision brief)?
- Please list any documents we should request first to make that workshop productive (e.g., vendor lists, P&IDs, latest MTO, geotech report).
-
-
Customer Discovery
Clarify desired capital outcomes, constraints (budget, schedule, location), stakeholders, and measurable success signals.
Discovery Questions
Opening: How This Project Feels Right Now
- In one sentence, describe the project and your role in it.
- Which stage best describes where the project is today?
- What is the current decision or sanction timeline you are working toward?
- Which primary business driver(s) are pushing this investment?
- What's the target budget band for this project (order of magnitude)?
- Briefly—how would you describe the emotional stakes for you and your team on this project?
Are We Overconfident About Schedule?
- If I said schedule is the single most likely thing to slip, would you agree—and why?
- Which of these schedule pressures are most real for this project today?
- From prior projects, what were the three biggest root causes of delay you encountered?
- How much schedule contingency have you realistically allowed for (in months)?
- Who in your governance structure is explicitly accountable for schedule risk (owner, contractor, shared, unclear)?
- If the schedule slipped by one month, what would that practically mean for revenue, penalties, or stakeholder confidence?
Who Really Decides—and Who Gets Blamed?
- Who would you be surprised to discover has actual veto power or strong influence on the final sanction decision?
- Which stakeholder groups must sign off before you can sanction (select all that apply)?
- How aligned are those stakeholders on the relative priority of cost, schedule, and performance?
- Describe the formal approval gates and any informal veto points we should plan around.
- What meeting cadence and forums typically determine key decisions (steering committee, PMO, board, other)?
- Tell us about a prior project where stakeholder misalignment caused a major problem—what happened and how was it resolved?
What Hidden Risks Are You Quietly Hoping Will Never Happen?
- What's the one risk you hesitate to say aloud but check on constantly once procurement or construction starts?
- Which of these risks keep you awake at night for this project?
- Which of those risks have actually materialized on your recent projects (last 5 years)?
- How do you currently quantify and track those risks in your controls (probability, impact, mitigation plans)?
- What mitigation approaches have you tried that failed to deliver the expected protection?
- If one of these risks crystallized tomorrow, who executes the contingency and what’s the fastest realistic response?
If Money Weren't the Only Constraint, What Would You Build?
- If budget were unlimited for one aspect of the project, which area would you invest in to guarantee success?
- Which of these outcomes matter most to your executive team (select up to three)?
- What specific, measurable success signals would prove this project was a win (e.g., start-up date, throughput, OPEX reduction, emissions figures)?
- Which performance guarantees are non-negotiable from your perspective?
- How would you prefer those guarantees to be contracted (lump-sum with LDs, target cost with incentive, availability-based, hybrid)?
- When success happens, how do you expect stakeholders to recognize it—what changes materially for the business?
What's the Real Limit on Budget, Schedule, and Location?
- Which would you rather bend than risk—budget, schedule, or location—and why might the others break the project?
- What is the absolute budget cap you cannot exceed?
- Are there strict external milestones forcing the schedule (regulatory deadlines, seasonal access, customer commitments)?
- How flexible is the site/location—fixed, limited alternatives, or open to relocation or modular options?
- Which top three constraints (budget, permits, workforce, logistics, community acceptance, other) would force you to delay or downscale?
- If we proposed a phased delivery to capture early revenue, how attractive would that be and why?
What Does Trust Look Like to You in an EPC Partner?
- What would make you immediately skeptical of an EPC partner, even if their technical proposal looked strong?
- Which partner attributes matter most when you ask for single-point responsibility?
- How do you weigh contractor financial backing against demonstrated operational track record?
- Give an example where a contractor relationship exceeded expectations—what behaviors or structures built that trust?
- What governance, reporting cadence, or KPIs would make you feel confident during execution?
- What contractual red lines (terms or guarantees) would stop you from awarding to a supplier?
What Next Step Would Move This From Talk to Action?
- What's the smallest concrete next step that would convince you this project is moving forward?
- How ready is your team to engage in a detailed FEED or firm proposal process right now?
- Which materials or evidence would speed a decision for you?
- Who should attend a commercial workshop to resolve open issues (roles, not names)?
- What are realistic target dates for a workshop, a proposal submission, and a commercial decision?
- If we follow up with a concise plan, which format would be most useful to you?
-
Solution Experience
Walk through how integrated EPC delivery achieves the customer’s outcomes using their project context, trade-offs, and real scenarios.
Experience Meetings
- Experience Prep & Current-State Confirmation
- Solution Narrative: How Integrated EPC Maps to Your Outcomes
- Scenario Walkthroughs: Baseline, Optimized, and Contingency
- Risk, Guarantees & Validation Decision Session
- Schedule Solution Scope kickoff with confirmed owners and hand over the validated scenario package.
- Seller to prepare critical-path visualizations and mitigation cost/benefit snapshots for scenario modeling.
- Customer to validate and comment on the responsibility map and mitigation examples.
- Confirm Scenario Assumptions
- Validate which scenario reliably meets the customer’s success signals and which does not.
- Surface explicit trade-offs and required decisions (e.g., accept higher price for schedule acceleration).
- Agree on residual risks and which mitigations must be contractually guaranteed.
- Seller to update scenario models with final customer inputs and issue side-by-side comparison documents.
- Customer to nominate decision owners and timelines for each trade-off item.
- Seller to produce a prioritized list of mitigations tied to cost and schedule sensitivity.
- Top-Risk Readout from Scenarios
- Agree the commercial structure options that sufficiently mitigate the customer’s top risks.
- Obtain explicit customer validation of the future-state proof points and acceptance criteria.
- Confirm owners and timeline for producing the Solution Scope and commercial proposal.
- Seller to draft commercial options (lump-sum and target structures) with associated guarantee and bonding terms for customer review.
- Seller to produce a signed validation checklist capturing accepted success signals and residual risks.
- Introductions & Objectives
- Receive and agree a crystal-clear one-sentence current-state description from the customer.
- Agree quantified consequences in cost, time, or risk that make the problem urgent.
- Co-create a one-sentence future-state outcome and 3–5 measurable success signals to validate against.
- Confirm dataset and deadlines for scenario modeling pre-work.
- Customer to deliver the one-sentence current-state, updated project dossier, and quantification of consequence (cost/schedule/risk) within 48 hours.
- Seller to validate received dossier, flag missing inputs, and confirm assumptions to be used in scenario models.
- Schedule the Scenario Walkthrough meeting and share the scenario template for customer review.
- Brief Recap of Agreed Current/Future State
- Customer can trace how each EPC function and guarantee directly addresses their stated problems.
- Agree a responsibility boundary map (who owns FEED, procurement, fabrication, construction, commissioning).
- Agree 2–3 mitigation strategies that materially reduce the quantified consequences and the metrics to validate them.
- Confirm validation checkpoints that will be used in scenario walkthroughs.
- Seller to produce a draft Responsibility Matrix (RACI) tied to the customer’s project context and share within 3 business days.
- Baseline Scenario Walkthrough
- Integrated EPC Delivery Overview (Proof Elements)
- Customer Current-State Readback (One Sentence)
- Mapping Guarantees to Risks
- Commercial Options & Trade-offs
- Consequence Quantification
- Optimized EPC Delivery Scenario
- Mapping: EPC Workstreams to Your Project Context
- Contingency / Worst-Case Scenario
- Validation: Customer Risk Appetite & Acceptance Criteria
- Define Future-State (One Sentence) & Success Signals
- Critical-Path & Mitigation Examples
- Trade-off Table & Decision Points
- Validation Checkpoints & Acceptance Criteria
- Confirm Next Steps into Solution Scope and Mutual Commit Inputs
- Pre-work for Scenario Walkthroughs
-
Solution Scope
Define scope boundaries, modules (FEED, detailed engineering, procurement, fabrication, construction, commissioning), responsibilities, and acceptance criteria.
Scope Configuration
- Procure and deliver long‑lead process equipment
- Fabricate modular process skids and assemblies
- Manufacture structural steel and pipe spools
- Heavy‑lift transport and on‑site equipment setting
- Civil earthworks, foundations, and concrete structures
- Structural steel erection and mechanical installation
- Piping erection, welding, insulation, and hydrotesting
- Electrical installation and substation commissioning
- Instrumentation, DCS/PLC field wiring and loop checks
- Install firefighting, gas detection, and ESD systems
- Pre‑commissioning: flushing, purging, and cold tests
- Commissioning, start‑up and performance testing
- Provide site accommodation, utilities, and logistics support
- Supply critical spare parts, preservation, and tool kits
- On‑site operator training and final handover documentation
Scope Questions
Procure and deliver long‑lead process equipment
- Which long‑lead equipment items are required for this project?
- For each long‑lead item, what is the required delivery date or project milestone (item : date)?
- Are vendor selection and management included in scope (single‑point procurement, vendor QA/QC, expediting)?
- What design codes, performance guarantees, or certifications must equipment meet (e.g., ASME, API, ISO)?
- What FAT/Witness/Test requirements apply and who will witness or accept FATs?
Fabricate modular process skids and assemblies
- How many skid modules and/or assemblies are expected (approximate count or schedule)?
- What level of integration is required in each skid (piping, wiring, insulation, instrumentation)?
- Are there transport or weight/size constraints for skids (max width/height/weight or route restrictions)?
- Do skids require factory acceptance testing, pre‑assembly, or temporary preservation for overseas shipment?
- Who will provide skid drawings, 3D models, and interface points for site integration?
Manufacture structural steel and pipe spools
- What is the estimated steel tonnage and spool count (or provide drawing reference)?
- Which fabrication standards and welding qualifications apply (e.g., AWS, EN, ASME)?
- Are material traceability and mill certificates required for all items?
- Will spool fabrication include pre‑insulation, cladding, or pretesting (e.g., fit‑up checks)?
- Do you require storage, preservation, and staged delivery from the fabrication yard to site?
Heavy‑lift transport and on‑site equipment setting
- What are the maximum weight and dimensions of the largest pieces to be transported and set?
- Are specialized heavy‑lift methods needed (strand jacks, skidding, SPMT, quay/port handling)?
- Are there route or site constraints (bridge limits, narrow roads, rail, permit restrictions)?
- Who is responsible for heavy‑lift equipment, rigging design, and lifting plans (owner, contractor, third‑party)?
- Will temporary works (crane pads, shoring, spreader beams) and lift exclusion zones be required and approved?
Civil earthworks, foundations, and concrete structures
- Is a geotechnical report available and are ground improvement works anticipated?
- What is the approximate excavation and fill volume or area to be prepared?
- Which foundation types are required (shallow pad, piled, raft, rock anchors)?
- Are environmental or permitting constraints affecting civil works (protected areas, seasonal limits, mitigation)?
- Who will provide civil design packages, as‑built survey control, and acceptance criteria?
Structural steel erection and mechanical installation
- Will erection be self‑performed or subcontracted by the contractor?
- What are height/access constraints, winter/monsoon season impacts, or permit limits for working hours?
- Are temporary access, scaffolding, and fall‑protection systems required to be supplied?
- What mechanical installation scope is included (equipment alignment, grouting, coupling, lubrication)?
- What inspection and acceptance criteria apply for erection and mechanical works (NDT types, tolerance limits)?
Piping erection, welding, insulation, and hydrotesting
- What piping materials and classes are in scope (CS, SS, duplex, alloy, lined)?
- Will spool erection occur from shop spools or field fabrication for weld‑up?
- What welding procedures and qualifications are required and which parties hold WPQs?
- What hydrostatic or pneumatic test pressures and scope (line segments, systems) are required?
- Is insulation and cladding on scope, and what thermal/cryogenic specifications apply?
Electrical installation and substation commissioning
- Which voltage classes are included (LV, MV, HV) and approximate main equipment list (transformers, switchgear)?
- Are cable schedules, tray routing, and earthing/grounding design provided or requiring contractor delivery?
- Who is responsible for temporary site power and distribution during construction?
- What commissioning tests are required for electrical systems (power tests, protection relay testing, insulation resistance)?
- Are local electrical authority inspections or grid‑connection approvals required and who will manage them?
Instrumentation, DCS/PLC field wiring and loop checks
- What control system platform and vendor are specified (DCS, PLC, brand)?
- What is the estimated I/O count and are smart field devices (HART, FOUNDATION Fieldbus) used?
- Who is responsible for loop diagrams, marshalling, and hook‑up drawings?
- Is FAT/SIT required for control systems and are witness/test scopes defined?
- Are instrument calibration, tagging, and traceability records required as deliverables?
Install firefighting, gas detection, and ESD systems
- Which safety systems are required on scope?
- What regulatory or client standards apply to safety systems (e.g., NFPA, IEC, local regs)?
- Do safety systems need to integrate with DCS/PLC or separate safety PLCs (SIS)?
- What coverage and detection zoning is required for gas detectors and fire detectors?
- Are third‑party certification, functional safety assessments, or SIL verification required?
Pre‑commissioning: flushing, purging, and cold tests
- Which systems require pre‑commissioning (process lines, utilities, compressed air, cooling water)?
- Are chemicals or special media required for flushing/preservation and are there handling restrictions?
- Who approves pre‑commissioning procedures and permits to work (owner, EPC, third‑party)?
- What acceptance criteria apply for cold tests (pressure limits, leak rate, functional checks)?
- Are temporary utilities and isolation plans required to support pre‑commissioning activities?
Commissioning, start‑up and performance testing
- What performance guarantees or acceptance tests are specified (capacity, efficiency, emissions)?
- Will the contractor provide start‑up crews and operator support, and for what duration?
- Are third‑party performance tests or independent verification required?
- What are the ramp‑up and warranty periods tied to performance acceptance?
- Who signs off commissioning checklists and final acceptance (owner, engineer, contractor)?
-
Mutual Commit
Resolve commercial structure (lump-sum/target), guarantees, bonding, milestones, liquidated damages, and governance for performance delivery.
Agreement Modules
- Statement of Work (SOW)
- Commercial Structure Agreement
- Price Breakdown & Payment Milestones
- Performance Guarantees & Acceptance Tests
- Bonds, Parent Guarantees & Security
- Liquidated Damages, Incentives & Caps
- Governance, Decision Rights & Escalation
- Change Order & Variation Procedure
- Procurement & Long‑Lead Commitments
- Subcontracting & Self-Perform Plan
- Insurance & Risk Allocation Matrix
- Milestone Acceptance & Handover Protocol
- Confidentiality & Data Exchange Agreement
- Dispute Resolution & Governing Law
- Termination, Suspension & Exit Terms
-
Deployment
Operationalize rollout with readiness checks, enablement, and outcome validation.
-
Pre-Deployment Readiness
Confirm permits, site access, fabrication schedules, long-lead procurement status, insurance, and readiness of owners and contractors.
Readiness Questions
Start Here: Your Project, Squared Away
- What is the project name, site/location, and primary owner organization?
- How would you describe the current project phase?
- What is the rough order of magnitude for capital value (select closest)?
- Who is our main point of contact for commercial and who for technical conversations? (Name + role)
- What single outcome, if achieved, would make this project a clear success for you?
Are We Underestimating the Risks That Will Stop This Project?
- What keeps you awake about delivery risk on this project—what’s the one scenario you worry will derail plan A?
- Which of these risk areas feel most unresolved today?
- Tell us about the single largest long‑lead item for this scope and its current procurement status (specific vendor or model if known).
- How confident are you in your current supply‑chain resilience for key equipment?
- Have you experienced comparable supply or execution shocks recently on other projects? What happened and how long did recovery take?
Who Actually Signs Off—and Who Can Stop It?
- Who are the decision-makers that must explicitly approve moving forward, and who influences them most?
- Which approval gates apply for this project (select all that apply)?
- How predictable are your internal approval timelines—do they slip, and by how much on average?
- Which stakeholder groups would you say are most skeptical of an integrated EPC single‑point model, and why?
- If we needed an executive-level briefing to reassure the board or CFO, what facts or guarantees would they require to proceed?
Where The Schedule Is Most Fragile
- If the schedule had a single Achilles’ heel, where would it be—permits, fabrication, transport, or workfront readiness?
- What are your committed milestone dates today (FID, major procurement, mechanical completion, start-up) and which are fixed vs aspirational?
- How much schedule float remains between award and first critical milestone?
- Which activities have you already de‑risked, and which still need a mitigation plan?
- If permit timing slips by 3 months, what impact would that have on cost and delivery—describe worst realistic outcome?
What 'Good' Really Means — Not Just Cost or Date
- Beyond schedule and budget, what measurable performance outcomes must be met for this project to be accepted?
- Which acceptance tests or performance guarantees will be non‑negotiable at handover?
- How will performance be measured and by whom during the warranty/defect liability period?
- What penalty or remedy structures do you expect if performance guarantees aren’t met?
- How important is operator and maintenance team readiness at turnover versus hitting a mechanical completion date?
Money, Guarantees and the Questions That Keep Finance Up
- If you had to choose, would you prioritize a fixed lump‑sum price, a target cost with shared savings/risk, or another model—and why?
- What level of contractor financial security and bonding is required by your procurement rules?
- How much cost contingency do you expect to hold at sanction, and where would you accept scope adjustments first?
- Have payment milestones driven by construction progress created disputes on past projects? What were the common causes?
- What commercial protections would make you comfortable shifting more execution risk to a single EPC partner?
What You’ve Tried Before—Lessons That Matter Now
- Tell us about a past project where delivery didn’t meet expectations—what were the root causes and who was accountable?
- Which contracting approaches on previous projects produced the best outcomes for you (in‑house EPC, multiple contractors, EPC with major subcontractors)?
- What types of vendor or contractor evidence (case studies, performance data, reference visits) have most effectively reduced your concerns historically?
- Where do your teams usually experience the most friction with contractors—change orders, quality, schedule, commercial claims, or safety performance?
- If you could rewrite one clause or process from past contracts to avoid repeating a failure, what would it be?
People, Culture, and Local Complexity — The Soft Risks
- How would you describe the relationship between your internal team and external contractors today—trusting partnership or transactional oversight?
- What local constraints (labor rules, union issues, security, cultural factors) deserve early attention?
- How important is local content or workforce development to project approval for your stakeholders?
- Describe any site or community sensitivities that could escalate if the project faces delays.
- Would you prefer the EPC to manage local partnerships and hiring, or to carve that into a client‑managed scope?
What Would Give You Confidence to Move Forward Right Now?
- If we could remove one single source of uncertainty in 60 days, what should it be?
- Which proof points would most change your view of an EPC partner’s credibility?
- How valuable would a jointly developed early works and procurement acceleration plan be to your stakeholders?
- What information or deliverables do you need next from a prospective EPC to brief your board or investment committee?
- Would an early commercial pilot or staged contracting approach help bridge internal approvals here? If so, which form (early procurement-only award, engineering-only, small civil works)?
Practical Timelines—When Will Decisions Actually Happen?
- What is the next formal decision milestone and its target date (e.g., board approval, FID, award)?
- How committed is the organization to that milestone—would missing it trigger a re‑baseline or project pause?
- Who needs to be involved in a decision briefing to ensure a yes on the next milestone?
- Realistically, how quickly could you provide access to site data, prior studies, and stakeholder lists if we requested them?
- What would be an acceptable cadence for joint governance (weekly, biweekly, monthly) during pre-deployment to keep momentum?
Final Check—What Have We Missed That’s Important to You?
- Is there any hidden constraint, political dynamic, or upcoming event we haven’t asked about that could change priorities suddenly?
- What does your ideal first 90 days with an EPC partner look like—three specific outcomes we should commit to?
- Would you like us to prepare a tailored one‑page risks & mitigations summary for your internal review? (If yes, please list required recipients)
- Any other notes, attachments, or prior reports you want to share now to speed alignment?
-
Deployment Enablement
Schedule and coordinate construction, logistics, commissioning, and quality/safety controls with clear owners and sequencing.
-
Validation Checklist
Verify handover criteria, performance testing, punchlist closure, and acceptance protocols are complete and documented.
Validation Questions
Start Here: Tell Us About Your Project
- What's the project's name and a one-line purpose statement we can reference?
- Which one best describes where you are today in the lifecycle of this project?
- Which funding or capital band does this project fall into?
- Who is the executive sponsor and which organizational functions will need to sign off? (select all that apply)
- What are the top three outcomes you absolutely need from a delivery partner? (choose up to three)
- What is your target or expected sanction / investment decision date?
If This Project Could Break Its Own Rules
- What's one assumption everyone is making about this project that you quietly doubt—what keeps you skeptical?
- Which constraints feel immovable right now (budget, schedule, regulatory, site footprint, etc.)?
- Have you deferred important decisions to maintain momentum? Tell us one decision still waiting and why it was deferred.
- How much genuine flexibility exists to trade cost for schedule or performance if push comes to shove?
- Which stakeholder groups in your organization are most likely to resist a change in delivery approach, and what are their main concerns?
- If the assumption you just named proves false, what is the first real-world consequence you expect to see?
Where Delivery Often Unravels
- Which single failure mode in delivery would be catastrophic for this project?
- Please rank the delivery risks you worry about most (select up to five).
- Have you had past projects where an EPC contractor missed guarantees or failed on execution? Briefly describe one example and its root cause.
- How confident are you that your current risk register and mitigation plans accurately reflect reality?
- Which specific suppliers, vendors, or equipment items do you consider single-source or schedule-critical?
- If a major delivery risk materializes, what escalation path do you expect the owner and contractor to take?
Show Me Your Decision Map
- Who truly signs the check for this project, and how often do their priorities diverge from the project team?
- Which approval gates are mandatory before sanction and throughout execution? (select all that apply)
- What is the expected cadence for governance meetings (steering committee, board updates, lender meetings)?
- How long does a typical approval take at each gate, and where do delays most commonly occur?
- Who will be our primary day-to-day commercial contact and who has authority over change orders?
- Are there non-negotiable reporting, audit, or compliance requirements we must embed into governance from day one?
What Good Really Looks Like
- If this project were judged in 12 months, what specific outcome would make you call it an unequivocal success?
- Which KPIs will you use to declare success? (select all that apply)
- What minimum performance guarantees or acceptance criteria are non-negotiable (quantify if possible)?
- What specific acceptance tests or performance trials will determine final payment and acceptance?
- Who signs off on final handover, and what documentation or evidence will they require?
- What post-commissioning support would you expect from a delivery partner (select all that apply)?
Hidden Realities of the Site—Tell Us the Unseen
- What small, ugly site detail would embarrass you if it surfaced during construction?
- What is the current status of critical permits and approvals for construction and operation?
- Are there known geotechnical, contamination, buried utilities, or structural issues we should plan around?
- Describe any live operations, tie-ins, or neighboring activities that must remain online during works.
- How constrained is laydown, storage, and on-site fabrication area?
- What local security, access, labor sourcing, or customs issues will materially affect execution?
Money, Guarantees, and the Things That Keep CFOs Awake
- What would make your finance team refuse to sign a lump-sum EPC contract today?
- Which commercial structures are you actively considering for delivery?
- What level or form of security, bonding, or parent company guarantee will lenders or your board expect?
- How comfortable is your organisation with liquidated damages, milestone penalties, or performance deductions?
- What payment milestone cadence and protections would you want to see to protect both parties?
- Are there lender or financing covenants that will materially constrain contract terms (select all that apply)?
If We Could Wave a Wand—What Would Change First?
- If you had an extra slice of budget or a few extra months, what's the single change you'd insist on to materially de-risk this project?
- How open are you to a single-point integrated EPC versus a split design-bid model for this scope?
- What would we need to demonstrate in our first proposal to earn a place on your shortlist?
- Which documents or data can you share now to accelerate alignment (select all that apply)?
- What would a sensible, high-impact first 90-day plan look like from your perspective (priorities and milestones)?
- When would you like to reconvene to review a proposed delivery approach and initial commercial terms?
-
-
Success
Review delivered outcomes against success signals, capture lessons learned, and maintain a shared channel for issues and improvements.
Success Reviews
- Success Review Workshop
- Performance Validation & Acceptance Testing
- Lessons Learned & Continuous Improvement Session
- Operational Handover & Long‑Term Support Setup
- Executive Close‑Out & Financial Reconciliation
Issues & Enhancements
- Agree spares provisioning and warranty claim paths to minimize operational downtime risk.
- Agree a clear retest and remediation plan for any non‑conformances.
- Deliver a consolidated test report package (raw data, processed results, calibration certificates) to the shared channel.
- Raise corrective work orders for failed tests with owners and retest timelines.
- Record signed witness statements or acceptance forms as per contract.
- Framing & Scope
- Capture a prioritized list of lessons with documented root causes and improvement actions.
- Assign accountable owners to each improvement and set realistic timelines for implementation.
- Define how lessons will be distributed (playbooks, training, contract clauses) and who will champion change.
- Produce a formal Lessons Learned report with prioritized recommendations and estimated effort/benefit.
- Update standard contract templates, procurement checklists, or execution playbooks where agreed.
- Schedule targeted knowledge‑transfer sessions or training for impacted teams.
- Handover Package Review
- Obtain formal acceptance of the handover package or record outstanding handover items with owners.
- Stand up a shared, traceable issues/improvement channel with SLAs and named owners.
- Opening & Objectives
- Provision the shared ticketing/issue board, invite all stakeholders, and publish the escalation matrix.
- Deliver the final handover package to the customer's document control and confirm receipt.
- Finalize and transmit the critical spares list and recommended procurement lead times.
- Commercial Position Summary
- Reach executive agreement on the final commercial settlement and timeline for financial close.
- Define conditions and dates for release of bonds/retentions and any contingent liabilities.
- Produce a concise board‑level close‑out package summarizing outcomes, lessons, and financial impacts.
- Issue the final settlement proposal and draft invoices/credit notes for approval.
- Prepare the board/finance executive summary and supporting annexes (scorecards, consequence analysis, lessons learned).
- Coordinate with legal and insurance to schedule release of guarantees and confirm any residual obligations.
- Align both parties on measured performance against every agreed success signal.
- Make an explicit decision for each success signal (accepted, partially accepted, not accepted) with owners.
- Agree a remediation plan with owners, schedule, and clear acceptance criteria for any outstanding items.
- Capture quantified consequence assessments to feed commercial reconciliation.
- Produce a one‑page outcome scorecard mapping each success signal to evidence and decision.
- Create a remediation register with owners, dates, acceptance criteria, and resources required.
- Schedule a follow-up validation meeting for unresolved items within the agreed timeframe.
- Compile the consequence analysis into the commercial reconciliation packet.
- Meeting Context & Acceptance Criteria
- Obtain customer confirmation that test evidence supports formal acceptance or clearly define outstanding test failures.
- Ensure all test evidence is traceable, auditable, and stored in the shared project record.
- Current State Recap (One Sentence + Key Metrics)
- One‑Sentence Current State
- Test Protocol & Methodology Review
- Quantified Consequences & Settlements
- Warranty, Guarantees & Claims Process
- Live/Recorded Test Results Presentation
- What Worked Well (Root Causes)
- Review of Agreed Success Signals & Metrics
- Spares & Long‑Lead Replacement Planning
- Release of Bonds/Retention & Final Payment Timeline
- Risk Transfer & Ongoing Liabilities
- Presentation of Delivered Outcomes (Evidence)
- What Failed or Created Friction (Root Causes)
- Traceability to Success Signals
- Shared Issues/Improvements Channel Setup
- Prioritization & Cost/Benefit Review
- Consequence Analysis
- Training & Competency Transfer
- Executive Sign‑off & Board Reporting
- Customer Witness & Validation Checks
- Ownership & Embedding Plan
- Root Cause & Responsibility Mapping
- Deficiency Handling & Retest Plan