Industrial & Manufacturing Industrial Manufacturing & Robotics Supply Chain Network Design

Inventory Strategy

Complex deployments where integration, safety, and operational handoff determine production success.

Example organizations in this space: Oracle Blue Yonder Kinaxis E2open

This interactive experience is the shipped product itself — the same application code customers run in production, mounted read-only in your browser over a real sample journey. Not a video, not a mockup: because the demo and the product are one codebase, it can never drift from the real thing.

Inside this journey
  1. Pre-Sales

    Qualify and diagnose before scoping the pilot and solution.

    1. Executive Outcome Discovery

      Align on strategic inventory objectives, competing finance and service priorities, key stakeholders, and measurable success metrics.

      Discovery Questions

      Quick orientation, so we start from the same page

      • Tell me briefly about the product groups or distribution centers that represent most of your inventory dollar exposure
      • How many SKUs do you actively plan at the SKU by DC level today? Options: Under 1,000, 1,000 to 5,000, 5,001 to 25,000, Over 25,000
      • Who owns inventory targets and trade offs between working capital and service level in your organization? Options: VP Supply Chain, Head of Planning, CFO, Head of Operations, Shared committee, Other
      • Walk me through the last time you approved a large inventory reduction or an across-the-board service level change, what drove that decision and what happened after

      Where inventory pressure actually lands, and what breaks first

      • If finance asked for a 10 percent reduction in inventory this quarter, what would break first operationally or commercially?
      • Which customer segments or product families are non negotiable for higher fill rates, even if they require more investment? Options: Top customers by revenue, Strategic product families, Contracted service levels, Seasonal lines, None are non negotiable, Other
      • How do stockouts on those priority SKUs show up in P&L or customer churn metrics for you?
      • Name the single metric your CFO tracks most closely that inventory changes must improve or at least not worsen Options: Inventory days on hand, Working capital tied to inventory, Inventory turnover, Gross margin impact, Free cash flow, Other
      • Which one answer from this section would make you stop a project immediately if it cannot be achieved? Options: Cannot maintain target fill rate for priority SKUs, No demonstrable reduction in inventory days, Pilot cannot produce traceable cost savings, Too disruptive to planning operations, Other

      How you currently decide stock levels, and where assumptions hide

      • Describe how your team currently sets reorder points and safety stock for a typical SKU, step by step
      • Which parts of that process are automated by the ERP planning module and which parts are handled manually or via spreadsheets? Options: Fully automated in ERP, ERP with manual overrides, Planner spreadsheets drive decisions, Hybrid with separate planning tool, Other
      • When planners argue for higher buffers, whose permission is typically required to reduce those buffers and why? Options: Planner alone, Planning manager, Operations manager, Sales manager, Finance approval, Cross functional committee, Other
      • How much confidence do you have in lead time estimates used today, and what is the single lead time issue that causes the most pain? Options: Very high confidence, Some confidence, Low confidence, Lead time variability unknown
      • If a statistical model suggested lowering inventory for 30 percent of SKUs, what internal rule or stakeholder objection would stop you from acting?

      Data truths and dust bunnies, the practical barriers we need to clear

      • If we requested 24 months of SKU by DC daily shipment history plus receipts and on hand, what typically prevents you from delivering that dataset intact? Options: No API or export available, Data split across systems, Missing historical records, Data ownership questions, Privacy or compliance blocks, Other
      • Which system currently holds your single source of truth for inventory and transactions? Options: ERP planning module, ERP core ledger, Separate planning tool, Data warehouse, Multiple systems, no single source, Other
      • Who on your team owns access to the transactional data and who would need to approve extraction for a diagnostic?
      • How clean is your master data for SKUs, locations, and lead times on a 1 to 5 scale, where 1 is unreliable and 5 is production ready? Options: 1, 2, 3, 4, 5
      • Which single data gap would kill a meaningful pilot for you if it cannot be addressed within the first two weeks? Options: No accurate shipment history, Missing supplier lead time data, No reliable on hand per DC, No sales order level visibility, Other

      Systems and integrations that actually determine feasibility

      • Which systems must we integrate with to operationalize recommendations after the pilot? Options: ERP planning module, ERP transactions, WMS, Supplier portal, Data warehouse or BI, Other
      • Who owns API or integration work and how many dedicated technical hours could they commit during a pilot window? Options: No dedicated hours, Less than 40 hours, 40 to 120 hours, Over 120 hours, Unknown
      • Are there firewall, VPN, or security approval steps that typically add more than two weeks to a vendor data connection? Options: Yes, usually, Sometimes, Rarely, No
      • Describe any regulatory, audit, or contract restrictions that limit how we can access or store transaction level data
      • If there is no integration possible during the pilot, would an extract and upload cadence be acceptable to validate model results? Options: Yes, acceptable, Maybe with conditions, No, integration is required

      The real risks that stop projects, candidly

      • Which failed or stalled projects from the past three years are most similar to this, and why did they not reach value?
      • When changes were implemented and later reversed, who pushed back and what was their main concern? Options: Operations, Planning, Sales, Finance, IT, Other
      • How do you measure implementation risk, and which single operational risk would make you decide not to proceed? Options: Planner workload spike, ERP instability, Supplier inability to meet revised orders, Customer service complaints, Other
      • What escalation path do you have when a pilot causes unexpected service impact during business hours? Options: Immediate stop and rollback, Rapid patch and continue, Triage during next business day, No formal path
      • If a pilot misses its KPI by 20 percent, would you expect a pause, a redesign, or to proceed to implementation with adjustments? Options: Pause and investigate, Redesign pilot, Proceed with adjustments, Decision depends on root cause

      Competitive landscape, what else you are weighing

      • Which external vendors, incumbents, or internal programs are you actively considering as alternatives to bringing in a specialist team? Options: Current incumbent consulting firm, Homegrown analytics team, Planning software vendor services, Another consulting firm, No other options being considered, Other
      • What would need to be true about your current approach for you to keep it instead of changing to an outside partner?
      • Has anyone internally proposed solving this without an outside partner, and if so who would lead that effort? Options: Yes, planning team, Yes, analytics/BI, Yes, operations, No internal proposal, Other
      • When you compare approaches, which outcome convinces finance faster, a one time inventory reduction or a sustainable improvement in turns and fill rate? Options: One time reduction, Sustainable improvement, Both matter equally, Undecided
      • Which single competitive advantage would make you choose a provider immediately? Options: Proven pilot case study in similar industry, Clear integration plan to ERP, Guaranteed KPI improvement, Low disruption to planners, Faster time to value

      What success looks like and the paperwork that must follow

      • Which KPIs will your leadership use to judge a successful pilot, and what target value for each would satisfy them?
      • If the pilot proves the modeled inventory reduction and maintains agreed fill rates, what stops you from converting to full implementation that week? Options: Budget approval, Procurement contracting, IT scheduling, Operational readiness, Nothing stops us
      • Who must sign off on a pilot to production path from your side and how quickly can they make that decision once evidence is in front of them? Options: VP Supply Chain, CFO, Head of Planning, Cross functional committee, Other
      • What acceptance criteria do you require before approving ERP parameter changes in production? Options: KPI thresholds met for 60 days, No customer escalations for 60 days, Successful dry run in test environment, Formal stakeholder sign off, Other
      • Which contractual or commercial terms would need to be present to move quickly after pilot success? Options: SOW with fixed scope and deliverables, Pilot to implementation conversion clause, Data access and security addendum, Payment milestone on acceptance, Other

      People, change, and the planner experience

      • Describe how your planners will know a new policy is correct and what training or documentation they will need to adopt it
      • How does planner capacity today limit the pace of change you can absorb? Options: No spare capacity, Limited capacity for small pilots, Can support a defined pilot, Can support broad rollout
      • Which stakeholder objections are usually emotional or political rather than data driven, and who tends to express them? Options: Sales, Operations, Finance, Planning, Procurement, Other
      • When past changes failed to stick, what follow up governance or review cadence was missing? Options: Monthly review with owners, Clear exception workflows, Ongoing training, Accountability for KPIs, Other
      • If adoption falters after go live, what single remedial step would you expect must be available to recover quickly? Options: Rollback parameters, Additional training, Daily command center until stable, Dedicated support from vendor, Other

      Immediate red flags and timeline realities

      • How soon do you need to see pilot results to meet internal budget or planning cycles? Options: Within 30 days, Within 60 to 90 days, This fiscal quarter, Flexible
      • Which procurement or legal steps typically add the most time to starting a vendor pilot? Options: Contract negotiation, Security review, SOW alignment, Data sharing agreement, Other
      • If during initial scoping we surface a major data or integration blocker, what is your preferred escalation: pause, patch, or re-scope? Options: Pause and fix, Patch to continue, Re-scope pilot, Decision depends on blocker
      • What single answer in this whole discovery would cause you to say not now to starting a pilot? Options: No data access, No technical owner available, Unwilling stakeholders, Timing constraints, Other
      • Are you ready to commit to a diagnostic extraction and a 60 to 90 day pilot if the initial scope and costs are acceptable? Options: Yes, Maybe with conditions, Not at this time
    2. Diagnostic Working Sessions

      Extract and validate ERP demand, supply, and inventory data, confirm data assumptions, and surface constraints for modeling.

      Working Meetings

      • Data Extraction Plan and Access Kickoff
      • Initial Extraction Review and Data Quality Assessment
      • Field Mapping and Derived Variable Definitions
      • Constraints, Business Rules, and Modeling Boundaries Workshop
      • Final Data Validation and Modeling Go No Go
      • Publish the constraint register with chosen treatments and pilot boundaries.
      • Publish the field mapping and transformation rules document for ETL implementation.
      • Implement transformation scripts and produce a sample transformed dataset for validation.
      • Log any unresolved field gaps and the approach to approximate or backfill them before modeling.
      • Identify supply and operational constraints
      • A prioritized constraint register is produced with an assigned treatment for each item.
      • Pilot scope and the set of constraints to include in the pilot model are confirmed.
      • List of additional data elements needed to quantify constraints is documented.
      • Confirm scope and success criteria
      • Gather any additional data required to quantify prioritized constraints and deliver to the transformation team.
      • Update the transformed dataset with constraint flags or indicators for use in the model.
      • Recap remediation status and open issues
      • Formal go decision to proceed to modeling or a documented no go with blocking issues and remediation plan.
      • Modeling run date and pilot kickoff window are scheduled if go is approved.
      • A list of any residual data fixes with deadlines is produced for tracking.
      • Publish the final validated dataset and the modeling readiness sign-off or the no go remediation plan.
      • If go, schedule the first model run and allocate compute and analyst time for the modeling window.
      • If no go, execute the remediation plan with target completion dates and deliver a revalidation extract.
      • A signed data extraction specification including tables, fields, date ranges, formats, and sample size is agreed.
      • Access method, credential handoff date, and first extract delivery date are scheduled.
      • Known risks to extraction are documented and an escalation path is confirmed.
      • Publish the agreed data extraction specification document to the shared workspace.
      • Prepare and deliver integration credentials or secure transfer access by the agreed date.
      • Run the initial extraction and deliver files for the Initial Extraction Review meeting.
      • Reconfirm extraction scope and sample review method
      • Data quality report with prioritized anomalies and severity levels is produced and agreed.
      • Remediation plan and timeline for each high severity anomaly are agreed.
      • Re-extract acceptance criteria and target date are confirmed.
      • Publish the formal data quality report listing anomalies, severity, and remediation actions.
      • Execute remediation actions in the source system or transformation layer and schedule the re-extract.
      • Deliver the second extract and an updated quality summary for the Field Mapping meeting.
      • Confirm master data mappings
      • A completed field mapping table linking source fields to modeling inputs is signed off.
      • Definitions and formulas for all derived variables are finalized and documented.
      • Any required proxy fields or acceptable approximations are documented for later validation.
      • Review required datasets and field-level requirements
      • Capture business and finance rules
      • Walk through the final transformed dataset and key validation metrics
      • Map transactional fields to demand and supply inputs
      • Automated quality check summary
      • Decide modeling treatment and boundary conditions
      • Define derived variables and calculation rules
      • Run modeling readiness sanity checks
      • Review key anomalies and representative examples
      • Agree access method, security, and delivery protocol
      • Prioritize constraints by impact and feasibility
      • Define extraction schedule and responsibilities
      • Decision and next steps
      • Agree transformation examples and sample output
      • Agree remediation plan and acceptance criteria for re-extract
      • Confirm blockers and escalation path
      • Set sign-off criteria for quality acceptance
  2. Solution Experience

    Walk through how demand segmentation, service-level modeling, and replenishment design will reconcile fill rate and working capital in the buyer's context.

    Solution Experience

    • Solution Experience: Inventory Strategy Walkthrough
    • Confirm the current state and its cost to your team
    • You confirm the presented demand segments match how your SKUs behave and the segments explain the observed stockouts and excess inventory.
    • Provide 12 to 24 months of demand, supply lead-time, and on-hand data exports for the selected pilot product family and distribution center.
    • Proof: Demand segmentation mapped to your sample SKUs
    • You accept the modeled service-level versus inventory trade-offs as the correct framing of the financial consequence you experience today.
    • Deliver a segmentation file and recommended target service levels and replenishment parameters for the proposed pilot family within five business days after this session.
    • Proof: Service-level modeling and the inventory vs working capital trade-off
    • Provide the ERP field mapping template populated with current parameter values for the pilot SKUs.
    • You agree to a specific pilot product family, distribution center, KPI targets, and the data evidence required to validate the model.
    • Confirm the pilot product family and DC selection and sign off on pilot KPI targets and acceptance criteria.
    • Proof: Replenishment design and ERP parameter mapping for the pilot
    • Validate this matches what you described
    • Align pilot evidence and next steps
    • Solution Experience: Inventory Strategy Walkthrough
    • Solution Experience Deck
    • Solution Brief — Inventory Strategy
    • meeting
    • slides
    • document
  3. Engagement Scope

    Define diagnostic deliverables, pilot boundaries, ERP integration responsibilities, training, timelines, and acceptance criteria.

    Scope Configuration

    • Extract and normalize 12–24 months of ERP demand and inventory data
    • Segment products by demand variability and strategic importance
    • Calculate inventory investment gap by product segment
    • Build lead-time variability and supply risk models
    • Develop replenishment policies: reorder points, order quantities, safety stock
    • Model service-level targets and trade-off curves by segment
    • Identify slow-moving and obsolete SKUs and create disposition plans
    • Run a 60–90 day pilot for one product family or distribution center
    • Validate model recommendations against pilot fill rate and turns
    • Integrate replenishment parameters into the existing ERP/planning module
    • Configure exception management rules and automated alerts in ERP
    • Deliver inventory and service-level dashboards and reports
    • Train planning team on new policies, exception handling, and SOPs

    Scope Questions

    Extract and normalize 12–24 months of ERP demand and inventory data

    • Do you have a single item master that contains SKU, description, product-family code, and unit-of-measure conversions? Options: Yes, No
    • Which ERP tables or export files will provide sales order history, purchase order receipts, and on-hand quantities for the 12–24 month window?
    • How many months of complete PO receipt and sales order history are available with reliable timestamps at SKU level? Options: 12 months, 18 months, 24 months, Less than 12 months
    • List any known data quality issues tied to your item master or transaction history (duplicate SKUs, missing timestamps, non-standard UOMs, split SKUs).
    • Confirm the minimum data acceptance thresholds for this diagnostic: percent of pilot SKUs with >=12 months clean history and required accuracy for receipt dates. Options: >=95% SKUs with >=12 months; receipt dates >=98% accurate, >=90% SKUs with >=12 months; receipt dates >=95% accurate, Other (describe)

    Segment products by demand variability and strategic importance

    • Who will provide or validate the product-family mapping and strategic priority labels (core, growth, seasonal) for each SKU?
    • Specify the product-family or commodity codes you want used for segmentation and attach up to 10 example families.
    • Indicate the minimum SKU history window you accept for statistical segmentation (12, 18, 24 months). Options: 12 months, 18 months, 24 months
    • Are there revenue tiers, margin bands, or customer-priority tags in your SKU master that must be included as segmentation inputs? Options: Yes, No
    • Provide the CSV or secure export location for the SKU list with monthly demand, product-family code, and any existing priority flags.

    Calculate inventory investment gap by product segment

    • How do you currently record inventory valuation by SKU (FIFO, weighted average cost, standard cost)? Options: FIFO, Weighted average, Standard cost, Other
    • Specify current target days of inventory or days-of-cover targets by product family that finance expects.
    • Attach the latest month-end inventory book value by product family (CSV or export path) for gap calculation.
    • List any allocation rules (channel holds, regional reservations, consignment) that affect available inventory for service-level calculations.
    • Estimate the acceptable percentage variance between modeled optimal investment and current book value by segment for proposed recommendations. Options: <=5%, 5-10%, 10-20%, Other

    Build lead-time variability and supply risk models

    • Which supplier lead-time fields and goods-receipt timestamps in your ERP should we extract for lead-time profiling?
    • Do you have drop-ship, consigned, or third-party logistics (3PL) receipt flows that require separate lead-time treatment? Options: Yes, No
    • When do you usually confirm POs versus actual receipt, and which team owns PO date accuracy?
    • State any supplier lead-time SLAs or contractual minimums we must honor in the lead-time model.
    • Explain how emergency expedites and rush receipts are flagged in your PO history so they can be excluded from baseline variability.

    Develop replenishment policies: reorder points, order quantities, safety stock

    • Name the owner who will approve new reorder point and safety stock parameter changes in your planning module.
    • Are economic order quantity constraints, minimum order quantities, or pallet-level constraints encoded in your item master or supplier contracts? Options: Yes, No
    • Confirm which fields in your planning export map to reorder point, safety stock, and reorder quantity.
    • Indicate whether lot-sizing rules vary by distribution center or are globally applied. Options: Vary by DC, Globally applied
    • Outline business constraints (supplier minimums, freight breakpoints, storage capacity) that must restrict recommended order quantities.

    Model service-level targets and trade-off curves by segment

    • Designate who will define target fill-rate percentages or service-level targets by product-family for modeling.
    • State the revenue or customer-priority tiers that should receive differentiated service-level targets in the trade-off analysis.
    • State whether there are contractual SLAs tied to specific SKUs or customers that the model must respect. Options: Yes, No
    • Outline acceptable trade-off thresholds between fill-rate improvement and percent reduction in inventory investment by segment.
    • Attach a historical sample of fill-rate or backorder reports that the model should compare against during validation.

    Identify slow-moving and obsolete SKUs and create disposition plans

    • State the aging buckets you use to classify slow-moving inventory (for example 90/180/365 days). Options: 90/180/365, 60/180/365, Custom
    • Are automatic chargebacks, scrap, or rework processes applied when SKUs meet your obsolete criteria? Options: Yes, No
    • Name the approval workflow and owner for disposition decisions (inventory write-off, return to vendor, remarketing).
    • Describe any legal, warranty, or regulatory holds that affect disposition timing for specific product families.
    • Upload a sample SKU aging report for one product family to validate proposed obsolete classification rules during pilot.

    Run a 60–90 day pilot for one product family or distribution center

    • Select the preferred pilot scope: single product family, single distribution center, or family-by-DC cohort. Options: Single product family, Single distribution center, Family-by-DC cohort
    • Choose the target pilot duration within the 60–90 day window. Options: 60 days, 75 days, 90 days
    • Assign who on operations will own day-to-day pilot execution, exception resolution, and daily checks.
    • Define the success KPIs and target thresholds for the pilot (fill rate %, inventory turns, working capital $).
    • Agree to pilot acceptance criteria including minimum sample SKUs, data feed completeness >=95% for pilot SKUs, and agreed KPI thresholds for pass/fail. Options: Agree, Need to discuss thresholds, Require custom criteria

    Validate model recommendations against pilot fill rate and turns

    • Define reporting cadence and owners who will validate daily pilot exceptions and weekly KPI roll-ups. Options: Daily exceptions / weekly KPI owner, Weekly exceptions / monthly KPI owner, Custom cadence
    • Explain how you will reconcile modeled recommendations with ERP-confirmed transactions during the pilot (who reviews, matching keys).
    • Declare tolerance thresholds for acceptable deviation between modeled and observed fill rate and turns (for example +/- 2 percentage points).
    • Upload a sample list of ERP transaction IDs (sales order numbers, shipment IDs, lot numbers) that will be used for pilot auditability.
    • Approximate the weekly planner hours required to review and action exception reports during the pilot. Options: <5 hours/week, 5-10 hours/week, 10-20 hours/week, 20+ hours/week

    Integrate replenishment parameters into the existing ERP/planning module

    • Name the integration endpoint that will receive replenishment parameters and state the accepted format (planning interface, flat-file import, API). Options: Planning interface (batch), Flat-file import (SFTP), API/endpoint
    • Include a mapping of each recommended parameter to the exact ERP field name that will be updated or indicate if you want us to propose mappings. Options: We will provide mappings, We want you to propose mappings, Hybrid
    • Please state whether a sandbox change window and rollback plan are required for parameter updates and list your preferred maintenance windows.
    • Agree on integration acceptance: parameter import success rate >=99% for pilot SKUs and rollback time within the agreed maintenance window. Options: Agree, Modify thresholds, Require further testing
    • Detail any custom business logic that must run when parameters are written (for example suppress auto-replenishment for certain warehouses) and name the rule owner.

    Configure exception management rules and automated alerts in ERP

    • Designate the primary owner for exception rule maintenance and escalation inside your planning organization.
    • List the alert channels you want for planners (ERP inbox, email, webhook to collaboration tool) and indicate whether alerts should create tasks. Options: ERP inbox, Email, Webhook to collaboration tool, Create tasks
    • Which exception thresholds should trigger automated alerts (safety-stock breach, replenishment delay, PO lead-time exceedance)?
    • Specify SLA targets for exception response and escalation for critical supply interruptions (hours). Options: 2 hours, 8 hours, 24 hours, Custom
    • Provide the target owners and backup contacts who will receive and action automated alerts during business hours and off-hours.

    Deliver inventory and service-level dashboards and reports

    • Which KPIs must appear on dashboards (fill rate, days of cover, turns, stockout count, obsolete value)? Options: Fill rate, Days of cover, Turns, Stockout count, Obsolete value
    • Do you require scheduled exports of reports (PDF/CSV) or interactive dashboards only? Options: Scheduled exports (PDF/CSV), Interactive dashboards only, Both
    • Indicate preferred visualizations for planners and managers (time series, heatmap by DC, cohort tables) and the primary audience for each.
    • Attach a sample report layout, BI wireframe, or list of fields you want in the executive summary.
    • Who in your team will own dashboard maintenance, permissioning, and scheduled refresh cadence?
  4. Pilot Validation

    Run a 60–90 day pilot on a selected product family or DC to validate model recommendations against live demand and agreed KPIs.

    • current_state
    • decision_readiness
    • success_criteria
    • desired_state
    • gaps
    • stakeholders
    • gaps
    • stakeholders
    • desired_state
    • success_criteria
    • decision_readiness
    • current_state
    • gaps
    • current_state
    • desired_state
    • success_criteria
    • stakeholders
    • decision_readiness
    • decision_readiness
    • decision_readiness
    • decision_readiness
    • decision_readiness
  5. Mutual Commit

    Finalize commercial terms, SOW, data-access authorizations, and pilot-to-implementation conversion conditions.

    Agreement Modules

    • Master Services Agreement (MSA)
    • Statement of Work (SOW)
    • Fee Schedule / Order Form
    • Data Access Authorization
    • Data Processing Agreement (DPA)
    • Pilot Acceptance & Conversion Agreement
    • Change Order Agreement
    • Non-Disclosure Agreement (NDA)
    • Integration Responsibility Matrix
  6. Deployment

    Operationalize rollout with readiness checks, execution, and outcome validation.

    1. Pre-Deployment Readiness

      Confirm owners, environments, data migration windows, cutover timing, and stakeholder availability required for implementation.

      Pre-Deployment Questions

      Environment and access

      • Which environments will the seller need access to for implementation (list environment name such as Production, Sandbox, Test and the date each will be available)? This schedules access and cutover windows.
      • Is a dedicated integration or test tenant available for pilot and deployment, or will work occur in shared environments? (this defines our rollback and validation strategy) Options: Dedicated test tenant available, Shared sandbox only, No test tenant — production-only work, Unknown — buyer/seller must coordinate

      Data and configuration

      • Which ERP/planning data categories will be migrated or synchronized during cutover? (select all that apply; used to size data extraction and transfer windows) Options: Replenishment parameters (RPs) and safety stock, Master item/location data, Demand history (sales/shipment records), Open POs/Work orders, Lead-time and supplier mappings, Historical inventory snapshots, Other
      • Has the source of truth for master data and demand history been agreed, and who owns final sign-off? Options: Buyer owns sign-off, Seller owns sign-off, Joint sign-off, Not yet decided
      • Are there open purchase orders, work orders, or pending change requests that must be frozen prior to migration? If yes, list which types must be frozen so we can plan freeze windows.

      People and ownership

      • Provide the primary owner (name, role, contact) for each workstream: ERP administration, data extraction, IT integration, planning operations, and finance approval. (these are our escalation and approval contacts)
      • Which roles must be available for immediate decision-making during cutover? (select all that apply) Options: ERP administrator, IT/integration lead, Head of planning / planning manager, Site operations manager/Warehouse lead, Finance approver (working capital sign-off), Vendor/third-party coordinator, Other
      • Is there a delegated approver who can sign off on cutover completion outside normal business hours? Options: Yes — delegated approver exists, No — senior sign-off required during business hours, Unknown — need to confirm

      Timing and constraints

      • List any scheduled blackout, financial close, or regulatory freeze windows in the next 90 days that prohibit configuration changes (dates and timezones). (we must avoid these when scheduling cutover)
      • Select the preferred cutover timing we should target for deployment. Options: Weekend (Saturday–Sunday), End-of-day weekday, End-of-month close window (explicit date required), Nightly low-usage window, Flexible — buyer will confirm
      • Which of the following constraints apply to this deployment? (select all that apply) Options: Regulatory or audit approvals required before changes, Third-party vendor coordination required, Multiple sites/locations require independent cutovers, Must maintain continuous operations (no downtime allowed), Data residency or compliance constraints, None of the above
      • Is there an agreed contractual or business deadline by which the buyer expects deployment completed? If yes, provide the target date.
    2. Configuration Details

      Lock exact ERP and planning configuration values — replenishment parameters, field mappings, roles, and integration settings the team will apply.

      Configuration Details

      Environments & Endpoints

      • Enter the exact Production ERP instance name we will write parameters to (enter the instance identifier as shown in your ERP admin console).
      • Enter the ERP planning-module endpoint URL we will call for parameter writes and reads (format: https://your-erp-host.example/path). Default: leave blank if endpoint is the same as your ERP base URL.

      Features & Modules to Deploy

      • Select which deployment actions to perform during cutover (these exact actions will be applied to the ERP during the Implementation & Cutover step). Options: Write replenishment parameters (reorder points & order quantities), Write safety stock values (calculated by model), Activate replenishment policy flags (policy IDs), Write minimum order quantity values, Assign exception owners (planner role assignments), Enable planner dashboard configurations

      Replenishment Targets

      • Default target service level for High-priority SKUs (enter numeric percent, no % sign). Default: 95
      • Default target service level for Medium-priority SKUs (enter numeric percent, no % sign). Default: 90
      • Default target service level for Low-priority SKUs (enter numeric percent, no % sign). Default: 85

      Safety Stock, Order Rules & Field Mappings

      • Safety stock rounding policy to apply when writing values to the ERP (Default: Round up to next integer unit). Options: Round up to next integer unit, Round to nearest integer, Allow fractional units (ERP supports decimals)
      • Enforce minimum order quantity (MOQ) check during parameter write? Default: Yes. Options: Yes, No
      • If MOQ enforcement is Yes, enter the exact ERP field name used for minimum order quantity (enter exact field/column name; leave blank if not enforced).
      • Enter the exact ERP SKU identifier field name that will serve as the primary item key for parameter writes (examples: ItemCode, PartNumber, MaterialID).
    3. Implementation & Cutover

      Execute ERP parameter updates, deploy replenishment policies, run planner training, and operationalize exception management with clear owners.

    4. Acceptance & Billing Sign-off

      Formal client acceptance checklist confirming deliverables, KPI targets, and handover items are met before the billing milestone closes.

      Checklist items

      • Receive written acceptance sign-off from buyer's designated approver for deployment deliverables
      • Confirm acceptance KPIs met or approved exceptions documented
      • Obtain UAT/functional verification sign-off for ERP/planning configuration
      • Verify rollback/backout point and test backout procedure
      • Deliver operational runbooks and exception management procedures and obtain acknowledgement
      • Confirm training completion and competence sign-off for planner and admin users
      • Validate production data integrations and feeds end-to-end
      • Handover configuration documentation and field-mapping inventory to buyer repository
      • Confirm monthly review cadence and monitoring access provisioned
      • Receive invoice/billing authorization per SOW billing trigger
      • Close or document remediation plan for outstanding punch-list items
  7. Sustain & Improve

    Maintain monthly review cadence to monitor outcomes, adjust parameters as demand shifts, and track issues and enhancement requests.

    Success Reviews

    • Go-live Health Check
    • First Measurement Review
    • 90-Day Realization Review
    • Monthly Operations Review
    • Quarterly Business Review

    Issues & Enhancements

    • Record and schedule approved ERP parameter changes with effective dates for the next run.
    • Publish the 90-day realization report with variance tables and closed-loop remediation items.
    • Open or update remediation tickets with specific validation criteria and target close dates.
    • Schedule the monthly monitoring cadence and confirm dashboard access permissions.
    • KPI trend review
    • Keep fill rate and inventory investment aligned with targets through incremental parameter updates.
    • Ensure the top operational issues are owned and scheduled for resolution within agreed windows.
    • Maintain a prioritized and timebound enhancement backlog for continuous improvement.
    • Reconfirm deployment checklist and owners
    • Log prioritized enhancement requests with estimated effort and target delivery quarter.
    • Produce the monthly KPI reconciliation file and publish to the shared workspace.
    • Cumulative KPI and ROI overview
    • Confirm quarterly progress on working capital reduction, fill rate, and inventory turns and quantify financial impact.
    • Agree the prioritized enhancement roadmap and target delivery windows for the next quarter.
    • Validate that governance and the review cadence are sufficient to sustain improvements.
    • Publish the quarterly realization and financial impact summary to the shared workspace.
    • Finalize owners and delivery quarters for the top three enhancement requests.
    • Update the governance RACI and confirm meeting cadence adjustments if needed.
    • Confirm that critical integrations and ERP parameter updates are functioning as expected.
    • Document and prioritize all high-severity hypercare tickets with target resolution windows.
    • Verify initial planner adoption signals and identify any targeted training needs.
    • Publish the hypercare ticket log with severity and target resolution dates.
    • Deliver first 30-day usage and exception-volume export for reconciliation.
    • Schedule targeted refresher training for planners on the new exception workflow.
    • Present KPI results vs targets
    • Validate the KPI calculations and underlying data sources for fill rate and inventory investment.
    • Agree a prioritized remediation plan with specific actions and target dates to close any KPI gaps.
    • Confirm the date and scope of the next measurement checkpoint.
    • Deliver reconciled KPI workbook that traces fill rate and inventory investment calculations to source transactions.
    • Create remediation tickets for each root cause with target completion dates.
    • Schedule a 30-day follow-up to validate the effect of implemented fixes.
    • Restate acceptance criteria and data sources
    • Establish a documented remediation plan for any remaining KPI variance with clear resolution timelines.
    • Confirm the monitoring windows and the data sources that will be used to verify remediation effectiveness.
    • Reduce outstanding high-severity hypercare tickets to an agreed small set with closure targets.
    • Proposed parameter adjustments
    • Enhancement roadmap and prioritization
    • Present 90-day outcome dashboard
    • Data quality and attribution check
    • Deployment and data validation
    • Open issues and enhancement backlog
    • Gap analysis and root-cause exploration
    • Process and governance health
    • Root-cause diagnosis for gaps
    • Early adoption signals and usage patterns
    • Risk review and contingency planning
    • Open issues triage and prioritization
    • Agree corrective actions and timeline
    • Short operational learning or escalation review
    • Remediation plan and monitoring agreement
    • Agree immediate remediation actions
    • Hypercare ticket burn-down status
First-Party AI